11/27/2023 0 Comments Parkdale elementary gym fireplaceReplace the existing phone system school with a new VOIP system to include phones in every classroom. Subscribe for our electronic subscription to weather alerts, school closures and our monthly newsletter. Also, reconfigure/replace the existing intercom system and integrate a new PA system and master clock with the new VOIP phone system. False Fire Alarm at Parkdale School November 4, 2022. Communicating the vision and stories that are taking place at Parkdale Elementary. Replace the existing phone system at Crisfield High school with a new VOIP system to include phones in every classroom. The work will include demolition of the exterior skin and cavity interstitial materials and replacement with new materials. To address water infiltration thru the falling masonry assemblies. Replace the intercom head end equipment, administration desk units, and rewire the equipment into the existing system. Replace the intercom head end equipment, administration desk units, and rewire head end into existing system. Replace the 24 year old domestic water heater system with two-100 gallons new water heaters. Replace the manually operated wooden bleachers. Repair and resurface asphalt surface and line painting/marking. Resurface the 27 year old original asphalt surface and line painting, project areas includes driveways, bus loop, parking and play areas. Replace the malfunctioning 10T Trash compactor. I wish I lived in Toronto so I can visit this amazing school by an. Replacement of the 10T trash compactor that was originally installed in 1989. Find popular gyms, health clubs and fitness centers near Parkdale, Toronto. Install a new cctv and video surveillance system. This hallway extension will connect two existing hallways thus increasing student safety and security of the building. Then replace with new VCT flooring.Ĭurrently some students have to go outside in order to access two classrooms. Remove the carpet, fritz tile, and VCT flooring. Installation of a system-wide standard Life Safety Communications System Replace concrete sidewalks and repave parking lots. Sidewalk Replacement & Parking Lot Repavement Mt Hood Meadows Nordic Center 14040 Highway 35, Mt Hood Parkdale. Mergenthaler Vocational-Technical High #410 Saturday, March 4 Columbia High School Gym 9:00 Start time. Communicating the vision and stories that are taking place at Parkdale Elementary. Replace Sidewalk, concrete apron, dumpster pad, curb, gutter and knee wall in parking lot. 1,369 likes 84 talking about this 2,309 were here. Sidewalk Replacement and Concrete Fixtures The request is to replace the Elevator (AA1524 or Elevator "A") Installation of network integrated access control on all primary perimeter entry/exit points used by students, teachers and staff and the public.Ĭoating of the parking lot & fixing cracks. Replace the manual stage folding partition. Replace the twenty-one year old PA system Sand and refinish the Main Gym Floor and the Auxiliary Gym Floor.Īdd a Power Conditioning Panel to balance the electrical usage and be compatible with the Local Utility Agency (SMECO). Replacement of the schools fire alarm system.Īdd Above Ground Storage Tank for Boiler Operation. Replacement of VCT gym floor with RobinWood Sport Wood Flooring System.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |